Study on Adjusting Contract Sum of Construction Projects from Contract Status Compensation Perspective

Article Preview

Abstract:

The initial contract status was formed when the contract was signed, firstly, this paper analyzed necessities of adjusting contract sum and practicable routes that could be followed for classifying and compensating contract status; which was initiated under three contract types, lump sum contracts, unit rate contracts and cost plus contracts for balancing the rights and obligations for both contract parties and aims to provide a reference for pushing forward construction progress smoothly.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2343-2348

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Limin Yang, and Ting Luo (2006). Construction Claim Model for Construction Contract Status.,J. Construction Management Modernization, (1): 41-43.

Google Scholar

[2] Xiaolong Li, Shuyi Zhang and Libin Wang (2006). Engineering Contract Status and Control Model of Status Changing., J. JURNALOF TONGJI UNIVERSITY (NATURAL SCIENCE), 34(6):564-568.

Google Scholar

[3] Heng Huang, Jianbo Yuan and Xiwen Zhu (2012). Application of Contract Status Control Model on Claims Management of the Highway Owners., J. Hihghway Engineering, 37(4): 84-88.

Google Scholar

[4] Lifang Jia (2012). Discussion on Contract Type Selection under the Mode of Bill of Quantities., J. SANXI ARCHITECTURE, 8(14):257-259.

Google Scholar

[5] Gesheng Dai (2014). Critical Problems in Biding Documents Preparation under the Mode of Bill of Quantities., J. China Biding, (4)17-20.

Google Scholar

[6] Yaohuang Guo and Yaping Wang (1999). Construction Claims Management., M. Beijin: CHINA RALWAY PUBLISHING HOUS.

Google Scholar

[7] Kun Li, Xuefen Zhou and Renliang Shan (2009). The Evolution Process for Contract Status and Interference Factors Analysis in Terms of the FIDIC Contract., J. Construction Economy, (3): 74-76.

Google Scholar

[8] Hu Cheng (1995). Status Study for Construction Contracting Contract., J. Construction Economy, (2):39-41.

Google Scholar

[9] Hu Cheng (2008). Construction Engineering Contract Management and Claims, M. Nanjin: Southeast University Press.

Google Scholar

[10] Yilin Yin, Jianyun Wang and Kaiyun Guo (2011). Research on Claim Management Based on the Analysis of Contract Status., J. Journal of Shenyang Jianzhu University ( Social Science), 13(3):299-302.

Google Scholar

[11] Wei Jiang (2009), Variation and the Reasonable Contract Sum Adjustment in Construction Stage., J. Journal of Xiangtan Normal University (Natural Science), 31(1)100-101.

Google Scholar

[12] Xiaoli Zhang (2013) Research on Realization Path of Payment Adjustment in Accordance with Construction Contract under Risk Allocation Perspective., D. Tianjin: Tianjin University of Technology.

Google Scholar