Probabilistic Risk Analysis for Highway Construction Management

Article Preview

Abstract:

Construction management is the totality of activities that address the managerial and technological aspects of highway construction, conducted during the planning, design, construction, and post-construction phases of the project, for the purpose of achieving scope, quality level, cost, schedule and other project performance objectives. The ability to better understand potential risks and how to manage those yields benefits far in excess of the costs of adopting risk management practices. In this paper, the most common set of processes including risk identification, assessment, analysis, mitigation, allocation, monitoring and updating are discussed, and the relationship between the computational method (the model) and its required inputs and available outputs is illustrated. The methodology and systematic process of probabilistic risk analysis, Monte Carlo simulation methods is conducted, and a comprehensive case study of probabilistic risk analysis for a highway construction management is given out, in which the sensitivity analysis and other output from the simulation model are illustrated to support the risk management plan. It is obviously that the probabilistic risk analysis of Monte Carlo simulation could provide very important information for a decision maker.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2363-2367

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ashley, D., Levitt, R, and Dziekan, M. (2009). A Quantitative Method for Analyzing the Allocation of Risks in Transportation Construction. MIT, Department of Civil Engineering, Research Report No. R78-25.

Google Scholar

[2] Federal Transit Administration (2010). Risk Assessment Methodologies and Procedures, Project Management Oversight under Contract No. DTFT60-98-D-41013, Washington, DC.

Google Scholar

[3] Highways Agency (2009). Delivering Best Value Solutions and Services—Highways Agency Procurement Strategy. Report of the Highways Agency, London, England.

DOI: 10.1093/ww/9780199540884.013.28599

Google Scholar

[4] Pennock, M., and Haimes, Y. (2010). Principles and Guidelines for Project Risk Management., Systems Engineering, 5(2), 89-108.

Google Scholar

[5] Smith, R.J. (2005). Risk Identification and Allocation: Saving Money by Improving Contracting and Contracting Practices., The International Construction Law Review, 40-71.

Google Scholar

[6] American Society of Civil Engineers (2010). Construction Risks and Liability Sharing, Volume II. American Society of Civil Engineers, Washington, DC.

Google Scholar

[7] American Consulting Engineers Council of America (2012). Owner's Guide to Saving Money by Risk Allocation. Authored by Robert J. Smith, Wickwire Gavin, P.C., American Consulting Engineers Council, Washington, DC.

Google Scholar

[8] Construction Industry Institute (2011). Allocation of Insurance-Related Risks and Costs on Construction Projects. Construction Industry Institute, Austin, TX.

Google Scholar

[9] Association for the Advancement of Cost Engineering International (2008). Professional Practice Guide 2: Risk. Michael W. Curran, Editor, AACE International, Morgantown, WV.

Google Scholar

[10] California Department of Transportation (2008). Project Risk Management Handbook. Report of the California Department of Transportation, Office of Project Management Process Improvement, Sacramento, CA.

Google Scholar