Schedule Management of Airport Flying Area Construction Based on BIM

Article Preview

Abstract:

Airport flying area construction is a complex dynamic process. Its typical features including: complex construction process, large construction area, underground pipe trench interwoven and so on. Traditional construction schedule management of airport flying area is based on Gantt charts and network diagrams, which is generated before the construction, not supporting real-time updates. A preliminary exploration of BIM-based schedule management in airport flying area engineering is conducted. Using Civil3D,Revit, Navisworks and MS Project software, the construction image progress model can be established. Manager also can achieve laying on the type of runway, the number of layers, daily progress charts and updates, and to achieve global control so as to improve management efficiency and management quality.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2653-2658

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Charles, E. Building Product Models: Computer Environments Supporting Design and Construction. (1999).

Google Scholar

[2] Olofsson T, Lee G, Eastman C. Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project, Taipei, 71-77.

Google Scholar

[3] Vineet R. Kamat, Julio C. Martinez. Visualizing Simulated Construction Operations in 3D, Vol. 15(4). 2001. 107-109.

Google Scholar

[4] Ospina-Alvarado, A.M., Castro-Lacouture, D. (2010). Interaction of Processes and Phases in Project Scheduling Using BIM for A/E/C/FM Integration., Construction Research Congress, ASCE, 939-948.

DOI: 10.1061/41109(373)94

Google Scholar

[5] Seokyon, H, Liu, L.Y. (2010). BIM for Integration of Automated Real-Time Project Control Systems., Construction Research Congress, ASCE, 509-517.

DOI: 10.1061/41109(373)51

Google Scholar