The Calculation Method of Basic Reserve Fund in Power Grid Construction Project: A Case Study from China

Article Preview

Abstract:

This paper studied the calculation method of basic reserve fund (BRF) based on distribution fitting and Monte Carlo Simulation (MCS) in power grid construction project (PGCP). BRF copes with the various unforeseen expenses in the process of budget compilation. Nowadays, the measuring method with fixed rate cannot adapt to the request, because of the BRF with larger uncertainty influence factors. MCS technique can achieve a good simulation to solve the problem of uncertainty. The research first uses MINITAB to analysis the distribution of various influence factors, then uses MATLAB to build calculation model to take the stochastic simulation for many times, finally gets a more realistic BRF. A case from China is used to confirm this calculation method works well.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2659-2663

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] J. He, Y. Y. Zheng. The Outstanding Papers of Power Grid Project Cost Management (China 2011).

Google Scholar

[2] Q. P. Zhong. Coal Technology, Vol. 30(2011), pp.123-125 (In Chinese).

Google Scholar

[3] National Development and Reform Commission. DL/T5367-2007. Budget Compilation and Calculation Standard in Electric Power Grid Construction Projects. Beijing: China Electric Power Press (2006).

Google Scholar

[4] Z. Yang. Nanjing Province, China, Nanjing University of Aeronautics and Astronautics, 2012 (In Chinese).

Google Scholar

[5] D. G. Zhang, Q. S. Geng. The Outstanding Papers of Power Grid Project Cost Management (China 2011).

Google Scholar

[6] G. Huang, X. D. Xu, D. Y. Zhuang. Water Construction and Conservancy, Vol. 2 (2010), pp.38-41 (In Chinese).

Google Scholar

[7] Y. F. Liao, F. Zhao, Z. Q. Wang. Journal of Catastrophology, Vol. 28(2013), pp.55-60. (In Chinese).

Google Scholar

[8] Ministry of Housing and Urban-Rural Development of the People's Republic of China, General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China. GB 50487-2008. Code for engineering geological investigation of water resources and hydropower. Beijing: China Planning Press, (2008).

Google Scholar