During the construction of excavation, adopting top-down method and taking steel sheet piles as maintenance structure, some projects involving surface subsidence, surface displacement, deep horizontal displacement, underground water level and steel bracing internal force are monitored. Based on monitoring data, prompt feedback and early warning can prevent excessive displacement, deformation and engineering accident. Every monitoring indicator under control effectively achieves safety assurance of excavation engineering and surrounding building, realizes informatization construction of excavation engineering and guides similar engineering forcefully.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

437-440

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Z. Z. Yin: Geotechnical Principles. Water Power Press, China, Beijing, 2007, in press.

Google Scholar

[2] H. B. Wang, H. X. Yang, H. Zhang: Architecture Technology, Vol. 41, 257-260(2010). (In Chinese).

Google Scholar

[3] G. F. An, J. Y. Gao: Chinese Journal of Geotechnical Engineering, Vol. 29, 872-879 (2007). (In Chinese).

Google Scholar

[4] Q. W. Li, L. H. Chen, J. M. Cheng: Construction Technology, Vol. 37, 30-32 (2008). (In Chinese).

Google Scholar

[5] G. X. Cai: Building Science, Vol. 25, 99-102 (2008). (In Chinese).

Google Scholar

[6] Z. H. Xu, W. D. Wang, J. H. Wang: Chinese Journal of Rock Mechanics and Engineering, Vol. 23, 4639-4644 (2004). (In Chinese).

Google Scholar