Effect of New Village Layout on Flood Control Based on Hydrodynamic Model in Henan Yellow River Floodplain

Article Preview

Abstract:

Rich land resources in Henan Yellow River floodplain as well as China's new rural construction strategy provides an opportunity for new rural construction in Yellow River floodplain of Henan province. In this paper, the flow changes before and after the floodplain 2D hydrodynamic mathematical model to simulate the village station construction, water changes can clearly reflect the village station, near the village before and after the construction area and the upstream and downstream, contribute to the analysis changes in hydrodynamic conditions before and after the village station construction and effect on the river regime change.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

162-166

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Wang Weijing. Discussion of Government in Lower Yellow River [M]. Zhengzhou: The Yellow River Water Conservancy Press, 2011. 10, In Chinese.

Google Scholar

[2] Liu Yun, Li Yongqiang. China Water Resources [J]. 2012. 6, In Chinese.

Google Scholar