Risk Analysis and Prevention from BT International Engineering Project

Article Preview

Abstract:

Based on the international project risk, because of government credit, through cost control, construction of cycle control and other measures, it proposed government guarantees, commercial insurance, investment portfolio and other risk prevention approach.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

5619-5622

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Liming Xia, Shuping Chen, Li Meng, Jinshuang Pan: The risk assessment on BT financing model based on fuzzy theory, Computer Design and Applications (ICCDA), 2010 International Conference (5)68-71.

DOI: 10.1109/iccda.2010.5540858

Google Scholar

[2] Hua Gao, Qiang Xie: Research on the risk identification and countermeasures of BT project, Information Management and Engineering (ICIME), 2010 The 2nd IEEE International Conference, 403 - 406.

DOI: 10.1109/icime.2010.5477722

Google Scholar

[3] Yan Ling, Zhao Yufei, Du Yaling: Research on the innovation BT mode of Urban Rail Transit Projects based on project control right — A case of Shenzhen Metro Line 5, Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference 1801 – 1805.

DOI: 10.1109/ieem.2010.5674556

Google Scholar

[4] Hua Gao, Li-juan Wang: Research on ROI of BT project based on Singel-factor APT model, Information and Financial Engineering (ICIFE), 2010 2nd IEEE International Conference, 841 - 843.

DOI: 10.1109/icife.2010.5609486

Google Scholar

[5] Gao Hua, Zhang Yi-yuan: Research on the difference between BT mode and other' finance modes, Advanced Management Science (ICAMS), 2010 IEEE International Conference on (2 )237- 239.

DOI: 10.1109/icams.2010.5552913

Google Scholar