Risk Management and Control from the BT Project of Government

Article Preview

Abstract:

Based on the Government of BT project risk analysis, the main risks are guaranteed by law, decision-making risk, management risk, liquidity risk, project quality and schedule risk. It Propose to develop risk control measures, to establish risk control mechanism to ensure the orderly conduct of the project.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

5623-5626

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Xi-zhen Gao: The research on the method of determining BT project repurchase price, Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on , 286 – 289.

DOI: 10.1109/icieem.2010.5646663

Google Scholar

[2] Jiang Zaolong , Wang Dongyan, Liu Xiaojun: The project management of the owners and the return on investment in BT mode Electric Technology and Civil Engineering (ICETCE), 2011 International Conference , 865 - 869.

DOI: 10.1109/icetce.2011.5774325

Google Scholar

[3] Gao Hua, Zhang Yi-yuan: Research on the difference between BT mode and other' finance modes, Advanced Management Science (ICAMS), 2010 IEEE International Conference (2)237-239.

DOI: 10.1109/icams.2010.5552913

Google Scholar

[4] Li Hong, Wang Rong: The Construction and Research on Index System of BT Project Performance Evaluation, Information Management, Innovation Management and Industrial Engineering (ICIII), 2010 International Conference on (2): 563 – 566.

DOI: 10.1109/iciii.2010.301

Google Scholar

[5] Gao Hua, Zhang Yi-yuan: Research on the difference between BT mode and other' finance modes, Advanced Management Science (ICAMS), 2010 IEEE International Conference on 237- 239.

DOI: 10.1109/icams.2010.5552913

Google Scholar