Abstract:

In order to make a rational planning of CAPP-PPC process, the differences of product serial and concurrent CAPP-PPC process were studyed in this paper. Based on Witness, Three kinds of product serial and concurrent CAPP-PPC process simulation model were established for products with different complicated degrees. Simulation results show the time of concurrent process is much shorter than serial process, for complex products, especially obvious.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1651-1654

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yang Wang, Xiaobing Liu. Unified product BOM model oriented to concurrent engineering. Application Research of Computers. 2010, 27(8): 2984-2990.

Google Scholar

[2] Hong-jun Liu, Rong Mo etc. Manufacturability evaluation method for aeroengine blade. Computer Integrated Manufacturing Systems. 2009, 15(7): 1328-1335.

Google Scholar

[3] OUYANG Kun-jun OuYang, De-zhi Zhang. Research on the Process and Cost Analysis Software for DFP of Fuzes. Journal of Shenyang Institute of Technology. 2001, 20(3): 43-47.

Google Scholar

[4] Huijie Li, Zhankui Li. Researching on Non-time Conflict in Product R&D Under the Setting of Concurrent Engineering. REFORMATION & STRATEGY . 2010, 26(1): 28-44.

Google Scholar

[5] Yijie Sun, Gongzhang Shen. Concurrent Multi-objective Subspace Optimization Framework in Aircraft Multidisciplinary Design Optimization. ACTA AERONAUTICA ET ASTRONAUTICA SINICA. 2009, 30(8): 1421-1429.

Google Scholar

[6] Zhaoyun Wu, Li Li, Han Zhao. Overlapping model and simulation optimization in concurrent product development. Computer Integrated Manufacturing Systems . 2011, 17(3): 552-558.

Google Scholar

[7] Qiao Wang, Zongyan Wang, Fei Huang, Shufang Wu, Huibin Qin. CE Oriented Product Variant Design System Research. Coal Mine Machinery . 2011, 32(7): 0222-0224.

Google Scholar

[8] Wang Ya-chao, Mahan Wu. Production logistics system modeling and simulation - witness system and application [M]. Beijing: Science Press . 2007: 76-77.

Google Scholar