The Critical Equipment Selection Used Criticality Analysis in Factory

Article Preview

Abstract:

The CA method of how to select target equipment in a whole plant for a PdM program is proposed in the paper. A set of evaluation standards using criticality analyzing approach are established. This method is applied in many plants and is verified with the actual condition of plant requirement. The evaluation results fit for the criticality of all plants and will be different in different plants because of service and functional role played even for the same type machine.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1045-1049

Citation:

Online since:

October 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Jack R. Nicholas, R. Keith Young. Predictive Maintenance Management, 3rd Edition. Reliabilityweb. com publication, (2008).

Google Scholar

[2] PdM program setup, www. fluke. com/pdm.

Google Scholar

[3] Yang Guang. Research on intelligent diagnosis and predictive maintenance system of mechanical equipment failures. Friend of Science Amateures. Vol. 10, 2011: 41-42.

Google Scholar

[4] Xia Yanchun. The Evaluation Method of Critical Equipments in a PdM System. The 2012 International Conference on Measurement, Instrumentation and Automation (ICMIA 2012), Applied Mechanics and Materials. Vols. 241-244 (2013), 2012, 9: 332-335.

DOI: 10.4028/www.scientific.net/amm.241-244.332

Google Scholar

[5] Xia Yanchun. The Establishment of a Flexible PdM System for Industry Detection. The 2012 International Conference on Information Technology and Management Innovation (ICITMI2012), Applied Mechanics and Materials, Vols. 263-266 (2013).

DOI: 10.4028/www.scientific.net/amm.263-266.457

Google Scholar