Research on Profit Claim of Contract Delay in Performance

Article Preview

Abstract:

In this paper, the delay in performance of profits claims is classified into two categories, Profits claim of schedule delays caused by contract delay in performance and Profits claim of No-schedule delays under the contract delay in performance. And the paper focuses on the contractor's profit under construction delay claims, combined with the analysis of specific cases to determine the amount claimed profits make different instructions.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

4781-4784

Citation:

Online since:

November 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Bu shuangshuang, Zong zhifang. Research on project claim for loss of profits [J]. Journal of anhui university of technology (Social science edition), 2013(3): 8-10.

Google Scholar

[2] Lv xuewen, You qinglei. Construction contract schedule delays and damages clause analysis [J]. Petroleum engineering construction, 2006, 32(3): 63-67.

Google Scholar

[3] Selles M.E.S., Rubio, J.A.C., Mullor, J.R. Development of a quantification proposal for hidden quality costs: applied to the construction sector [J]. Journal of Construction Engineering and Management , 2008(12): 749–757.

DOI: 10.1061/(asce)0733-9364(2008)134:10(749)

Google Scholar

[4] Li yudong. Research on construction expenses claims of contractor [D]. Peking: Ocean university of China, (2008).

Google Scholar

[5] Ji zhiwen, Lin tengfei. Analysis of construction engineering claims [J]. Heilongjiang science and technology information, 2013 (26): 195-195.

Google Scholar

[6] Fang jun. Engineering claim principle and quantitative analysis. building economy, 2002(5): 7-8.

Google Scholar

[7] Li junhong, Shenjie. Calculate the cost of construction delay claims [J]. Shanxi building, 2008, 33(36): 246-247.

Google Scholar

[8] Wu yuqin. In the process of project construction cost claim. Wit, 2008(10): 28-29.

Google Scholar