Project Management Plan's Research and Application under Resource Constraints

Article Preview

Abstract:

For the problems existing in the traditional RCS, a proved RL-RCS planning model is proposed, and the CPM calculation method of timing allowance which is in consideration of resource tensity, job complexity, risk level is feasible.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

4790-4793

Citation:

Online since:

November 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Xiangna Lu. The project plan and control. Beijing: Mechanical industry publishing house. (2004).

Google Scholar

[2] Kolisch R. Efficient Priority Rules for the Resource-constrained Project Scheduling Problem. (Journal of Operations Management, 1996) 14 ( 3 ): 179-192.

DOI: 10.1016/0272-6963(95)00032-1

Google Scholar

[3] Xu. Tutorial. China aerospace publishing house. Beijing: China aerospace press. (2003).

Google Scholar

[4] Jingbo Jiang, Ge Zhenming, He Zhi. The principle and application of network technology . Shanghai: Tongji university press. ( 1990).

Google Scholar

[5] Xiaoqiao Zhou. Project management tools and templates. Beijing: Tsinghua university press. ( 2005).

Google Scholar