[2]
Shang Yan,Li Sufen,Dai Lanhua. Study of characteristics of soil temperature variation and recovery under intermittent operation of ground source heat pump [J]. Journal of Dalian University of Technology,2012,52(3):350-356.
Google Scholar
[3]
Choi Jung Chan, Lee Seung Rae, Lee Dae Soo. Numerical simulation of vertical ground heat exchangers: Intermittent operation in unsaturated soil conditions [J]. Computers and Geotechnics, 2011, 38: 949-958.
DOI: 10.1016/j.compgeo.2011.07.004
Google Scholar
[4]
Zhao Lijun,Zhou Yasu,Zhang Xingyang,etc. Simulation on Soil Temperature Recovery for Ground Source Heat Pump,2010,10:34-37.
Google Scholar
[5]
Omer Ozyurt, Dundar Arif Ekinic. Experiment study of vertical ground-source heat pump performance evaluation for cold climate in Turkey [J]. Applied Energy, 2011, 88: 1257-1265.
DOI: 10.1016/j.apenergy.2010.10.046
Google Scholar
[6]
Luo Jin, Joachim Rohn, Manfred Bayer, etc. Analysis on performance of borehole heat exchanger in a layered subsurface [J]. Applied Energy, 2014, 123: 55-65.
DOI: 10.1016/j.apenergy.2014.02.044
Google Scholar
[7]
Gao Yuanyuan,Gao Liuhua,Zhao Jun. GSHPs analysis of long term operation characteristics [J]. Journal of North China Electric Power University,2012,39(1):105-108.
Google Scholar
[8]
Wang Huajun,Yang Lixin,Gu Jihao,etc. Case Analysis of Soil Temperature Field during Operation of Ground Source Heat Pump [J]. HV&AC, 2011, 41(7): 119-122.
Google Scholar
[9]
A. Michopoulos, D. Bozis, P. Kikidis, etc. Three-year operation experience of a ground source heat pump system in Northern Greece [J]. Energy and Buidings, 2007, 39: 328-334.
DOI: 10.1016/j.enbuild.2006.08.002
Google Scholar
[10]
Zhang Weiya, Wei Jun. Analysis of soilheataccumulation problem of ground source heat pump system in high temperature and high humidity areas [J]. Energy Procedia, 2012, 14: 198-204.
DOI: 10.1016/j.egypro.2011.12.917
Google Scholar