The Research and Application on Advanced Hot Rolling Scheduling System

Article Preview

Abstract:

Complex constraints, huge energy consumption and many other factors lead to the difficulty in hot rolling scheduling. This paper propose a new system to solve this scheduling problem. In order to meet the demand of an independent hot rolling plant, this system includes almost all functions in a scheduling process. C# and C++ is used to develop UI and intelligent algorithm. Oracle database and ADO.net is used respectively in data storage and connection with UI and algorithm. By integrating with Crystal Report, the change trend of relevant parameters can be seen and analyzed visually, which is convenient for modifying and improving. Through testing with some data selected from one hot rolling plant, usability is validated.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

869-873

Citation:

Online since:

March 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] K. Sun, G.K. Yang and C.C. Pan: Solving Hot Rolling Scheduling Problem by a New Population-based Extremal Optimization Algorithm[J]. BIC-TA, 2010: 2089-2193.

DOI: 10.1109/bicta.2010.5645061

Google Scholar

[2] ZHANG Xiao-xia etc. A decision support system with CT_ACO algorithm for the hot rolling scheduling[C]. Intelligent Computation Technology and Automation (ICICTA), 2010, Changsha: 65-68.

Google Scholar

[3] H.X. Zhang, X.T. Li and J.W. Hua: Computer Applications and Software. Forum Vol. 30(2013), pp.108-112.

Google Scholar

[4] Z. C,L.Q. Fan et al: China Metallurgy. Forum Vol. 16(2006), pp.39-44.

Google Scholar

[5] W.L. Xu. Study on Planning Methods of Integrated Production Based on Hot-rolling[D]. Chongqing(2009): 54.

Google Scholar