Application Analysis of Fastener Steel-Pile Scaffold in Hydropower Project Slope

Article Preview

Abstract:

Taking the example of the high slope treatment of JINPIN Hydropower Station of YA LONG River, in this paper the basic requirement,construction feature and forcing characteristic of the fastener steel-pile scaffold were introduced in detail, the scaffold setting up method of the working platform in slope treatment are designed, and the loading analysis, checking computation of the strength, rigidity and stability of primary members were making. At last, this paper adopted corresponding construction measure as per the uncertain factors. This paper can provide the design basis and reference for the similar scaffold engineering by the practice of this project.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

460-463

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Technical code for safety of steel tubular scaffold with couplers in construction(JGJ130—2001).China academy of building research[S].Beijing:China architecture and building press, 2001.

Google Scholar

[2] Load code for the design of building structures(GB50009—2001). Beijing: China architecture and building press, 2001.

Google Scholar

[3] Building construction handbook(edition four)[M]. Beijing: China architecture and building press, 2003.

Google Scholar

[4] Technical code for building slope engineering (GB50330—2002).Chongqing municipal commission of urban-rural development[S]. Beijing: China architecture and building press, 2002.

Google Scholar