Application Analysis of Fastener Steel-Pile Scaffold in Hydropower Project Slope

Abstract:

Article Preview

Taking the example of the high slope treatment of JINPIN Hydropower Station of YA LONG River, in this paper the basic requirement,construction feature and forcing characteristic of the fastener steel-pile scaffold were introduced in detail, the scaffold setting up method of the working platform in slope treatment are designed, and the loading analysis, checking computation of the strength, rigidity and stability of primary members were making. At last, this paper adopted corresponding construction measure as per the uncertain factors. This paper can provide the design basis and reference for the similar scaffold engineering by the practice of this project.

Info:

Periodical:

Edited by:

Xuejun Zhou

Pages:

460-463

DOI:

10.4028/www.scientific.net/AMM.94-96.460

Citation:

J. J. Yuan and C. Liang, "Application Analysis of Fastener Steel-Pile Scaffold in Hydropower Project Slope", Applied Mechanics and Materials, Vols. 94-96, pp. 460-463, 2011

Online since:

September 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.