Discussion on Solving down Leading of OPGW under Framework with Insulation

Article Preview

Abstract:

OPGW shall be lightening-proof and grounded after entering transformer station framework. Due to problems existing in grounding, optical cable is discharged and breaks down. For such a purpose, the Author investigates several down leading and grounding methods on OPGW framework, by comparing and analyzing, and proposes the framework down leading insulation not grounded. This method adopts framework insulation down leading not grounded and grounded reinforced on terminal tower to solve the issue of framework grounding and result in sound effects.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1006-1007)

Pages:

905-908

Citation:

Online since:

August 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhuang Shenjun, A Discussion on OPGW Optical Fiber Design. Journal of Henan Science and Technology Vol. 07 (2013), pp.67-68.

Google Scholar

[2] Zhan Zongdong. Research and discussion on grounding when introducing OPGW into substation. Sichuan Electric Power Technology Vol. 06 (2005), pp.13-14.

Google Scholar

[3] Liu Hongjun. Research and discussion on lightning protection and grounding technology in OPGW optical cable in electric power system. Digital Technology and Application Vol. 12 (2011), pp.35-37.

Google Scholar

[4] Hu Zhaohong, Li Songtao. Analysis on cases of special electric power optical cable OPGW accidents. Science and Technology for Development Vol. 10 (2011), pp.105-107.

Google Scholar

[5] Cai Ling, Zhou Zhou. Research and discussion on introduction of OPGW optical cable below gantry of substation. Hunan Electric Power Vol. 03 (2012), pp.43-44.

Google Scholar

[6] Li Xinhua. Discussion on grounding of OPGW optical cable introduced into substation. Science and Technology Information Vol. 25 (2013), pp.391-392.

Google Scholar

[7] Yang Ziqiang, Liu Jiannong. Suggestions on improvement of erection method for prevention of lightning strike against OPGW. Telecommunications for Electric Power System Vol. 02 (2011), pp.61-63.

Google Scholar

[8] Han Likui, Zhang Zhaohua, Han Xiaobing. Analysis of grounding method of the 220kV transmission line optical fiber composite ground wire. OPTICAL COMMUNICATION TECHNOLOGY Vol. 06 (2011), pp.33-35.

Google Scholar