Extension Model for Multi-Risk Evaluation in Equipment R&D Project

Article Preview

Abstract:

In order to improve the successful probability of equipment research and development project, new risk evaluation model should be provided. This paper expanded the dimension of project risk, and ameliorated the extenics method to construct the risk evaluation model. In this method, used the plus correlative function value between risk state to risk grading interval to multiply the middle value of risk grading interval to calculate the risk degree of single risk index in multi-dimensional risk measure index, then integrated the geometrical mean and arithmetic mean of single risk index to count the synthetical risk degree of equipment research and development project. Which provide new technique for equipment project risk evaluation.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1030-1032)

Pages:

2495-2500

Citation:

Online since:

September 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] LI Xiaoqian, ZHANG Zhifeng. SONG Yanping, MU Yanliang. Research on weapon equipment acquisition model based on risk sharing. Systems Engineering and Electronics, 2009, 31(8): 1927-(1929).

Google Scholar

[2] LI Kan. Risk Evaluation Method of Weapon Equipment Development Project Based on Support Vector Machine. Journal of Shanghai Jiaotong University, 2008, 42(1): 1851-1854.

Google Scholar

[3] Li Jinghui, Li Fang, Zheng Jianhua, Dong Peng. Research on the Risk Assessment Model for Project of Weapon Research. Ship Electronic Engineering, 2007, 28(8): 5-8.

Google Scholar

[4] CHEN Ming, LIN Guijuan. Technical Risk Management and Application of Complex Product Development. JOURNAL OF TONGJI UNIVERSITY (NATURAL SCIENCE), 2009, 37(8) : 1089-1095.

Google Scholar

[5] Sharpe W F.Capital asset prices:a theory of market equilibrium under conditions of risk.Journal of Finance,1964,19:425-442.

Google Scholar

[6] Markowitz H.Portfolio selection.Journal of Finance,1952,7:71-91.

Google Scholar

[7] Li Yinghua, Li Xingsi, Jiang Yuxi. Study on Information Entropy as a Solution to Measure Risk in Financial Market.OPERATIONS RESEARCH AND MANAGEMENT SCIENCE,2007,16(5):111-116.

Google Scholar

[8] Zhang Jiandong.Research on Military Education Organizational System based on Entropy Theory.National University of Defense Technology,2006.

Google Scholar

[9] Qin Shuang.A Study on Engineering Period risk of entropy theory.Xi'an University of Architecture and Technology,2007,5.

Google Scholar

[10] T.M.WILLIAMS.Two-Dimensionality of Project Risk.International Journal of Project Management,1996,14(3):185-186.

Google Scholar

[11] XIANG Pengcheng,ZHAO Yanling,WANG Lin.Multi-dimensional description and measurement of project risk.Journal of Chongqing University: Natural Science Edition,2007,30( 4) : 148-152.

Google Scholar

[12] Cai Wen, Yang Chunyan, He Bin.Extension logic.Beijing:Science Press,2003.

Google Scholar

[13] Wang Jing.Study on description logic based on extension set.Harbin Engineering University,2009,6.

Google Scholar

[14] Cai Wen, Yang Chunyan, Wang Guanghua.A NEW CROSS SUBJECT-EXTENICS.China Science Fund,2004(5):268-272.

Google Scholar

[15] Dai Shuhe et al. .Project risk analysis techniques.Chemical Industry Press,2007:148-150.

Google Scholar