Study on the Management of Construction Cost in Substation Project

Article Preview

Abstract:

As the market establishing and the project management mechanism for deepening reform , the project cost management is in a core position and playing increasingly important role in the project . Based on cost management analysis and relevant theories and methods, and it combined the content, features and current situation of cost management in substation project. The paper uses the method of PDACE process control theory and value engineering, it is applied to the cost management.of the substation project. This study played a major role on reducing the cost of construction project.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1030-1032)

Pages:

2639-2642

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Pelicer, Eugenio, Cost control in consulting engineering firms. Journal of Management in Engineering, 2005. 4: 201-205.

Google Scholar

[2] Pelicer, Eugenio, Cost control in consulting engineering firms. Journal of Management in Engineering, 2005. 4: 201-205.

Google Scholar

[3] Evans J.R., andOlson D.L. 2008. Introduction to simulation and risk analysis, Prentice-Hall, Englewood Cliffs, N. J.

Google Scholar

[4] Jack. Shank. Strategic cost management and the value chain. [M]. New York: the FreePress. (2003).

Google Scholar

[5] Robin Cooper Regine Slagmulder Develop profitable new products With Target Costing loan Management Review, (2009).

Google Scholar