Forward Horizontal Grouting Technology of Subway Station Ends

Article Preview

Abstract:

Guangzhou Metro Line 6 the 8th tender Tianhe Station tunnel shielding meet hole body fissure water is abundant, tunnel soil mass disintegrates easily when water permeate, consolidating with end-advancing horizontal grouting technique. By reasonable choice construction equipment, drilling location, double liquid grouting parameters to control the construction process, enhance process monitoring, get a good reinforcement effect; analyzed the prospects of the construction method.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1065-1069)

Pages:

364-367

Citation:

Online since:

December 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Technical specifications of Underground Project Waterproof[S], GB50108-(2008).

Google Scholar

[2] Jiujiang Cui, Tunnels and underground project repair techniques, Press of Science, (2005).

Google Scholar

[3] Ming Zhao, Subway tunnel construction quality control, Machinery Industry Press, (2005).

Google Scholar

[4] Huijun Feng, Tianjin Hongxing Road subway station Shield horizontal end well Grouting Technology, Construction Technology, 2009. 9 Vol38.

Google Scholar

[5] Zhihong Duan, Horizontal hole grouting in Metro Shield ends Reinforcement, Tunnel & Underground Project, 2010(10).

Google Scholar