Forward Horizontal Grouting Technology of Subway Station Ends
Abstract:
Guangzhou Metro Line 6 the 8th tender Tianhe Station tunnel shielding meet hole body fissure water is abundant, tunnel soil mass disintegrates easily when water permeate, consolidating with end-advancing horizontal grouting technique. By reasonable choice construction equipment, drilling location, double liquid grouting parameters to control the construction process, enhance process monitoring, get a good reinforcement effect; analyzed the prospects of the construction method.