The Combined Application of Intermittent Strengthening Strip and After-Irrigation-Strip in Certain Long Concrete Structure

Abstract:

Article Preview

Long concrete structure is frequently used in modern buildings or structures. As the main measures of achieving seamless construction and crack control of long concrete structure, strengthening strip and after-irrigation-strip have been widely applied. However, compared with after-irrigation-strip, the clear advantage of strengthening strip is closure ahead. Therefore, this paper from aspects of theoretical analysis and engineering application replace the after-irrigation-strip with intermittent strengthening strip in one original design of a project. Since the completion of construction, there are no harmful cracks in the structure. This article also describes the project quality control measures and technical and economic analysis for the design and construction of similar projects.

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Edited by:

Chaohe Chen, Yong Huang and Guangfan Li

Pages:

1190-1194

DOI:

10.4028/www.scientific.net/AMR.243-249.1190

Citation:

S. J. Yang et al., "The Combined Application of Intermittent Strengthening Strip and After-Irrigation-Strip in Certain Long Concrete Structure", Advanced Materials Research, Vols. 243-249, pp. 1190-1194, 2011

Online since:

May 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.