Finite Element Analysis for Refrozen Process of Bored Pile in Permafrost Region

Article Preview

Abstract:

The commercially available finite element program ANSYS was used to model the refrozen process of the bored pile. The effects of the refrozen process by casting temperature of concrete, heat of concrete hydration and air convention were analyzed. To estimate the time when the bearing capacity of the bored pile is formed, the finish time of refrozen process was determined by modeling the whole refrozen process of the bored pile. The calculated results are in good agreement with experimental data. The analysis shows that the refrozen process is related with the casting temperature of concrete. The higher the casting temperature is, the more time the refrozen process takes.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Pages:

1655-1658

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] G.L. Li: Journal of Railway Science Vol. 2 (1980), p.83

Google Scholar

[2] U.S. Army Cold Regions Research Engineering Laboratory: The Design and Construction of Foundation in Deep Seasonally Frozen Soil and Permafrost Region.

Google Scholar

[3] D. Li: Journal of Xi'an University of Arch. and Tech. Vol. 31 (1999), p.3

Google Scholar

[4] L.S. Gong: Practical Manual of Concrete (China Architecture Industrial Publishing Company, China 1995).

Google Scholar

[5] Design Standards of Architectural Foundation in Frozen Soil Region (China Architecture Industrial Publishing Company, China 1998).

Google Scholar

[6] J.S. Liu: Journal of China Coal Science Vol. 127 (2002), p.5

Google Scholar

[7] ANSYS Thermal Analysis Guide, Release 5.7, Second Edition. SAS IP, Inc. 1997.

Google Scholar