Evaluation on Excavation Design with VE Method

Abstract:

Article Preview

This paper obtains function index system of excavation by FAST method and introduces two-class fuzzy comprehensive evaluation to estimate function index system. By analyzing the excavation's life-cycle costs obtains the evaluation method for excavation design cost, proposing new evaluation standards for excavation design. At last establishing value engineering (VE) evaluated model for excavation design, and put it into engineering practice to prove that the model is convenient and practical, simple, fast, and accurate.

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Edited by:

Chaohe Chen, Yong Huang and Guangfan Li

Pages:

2345-2350

DOI:

10.4028/www.scientific.net/AMR.243-249.2345

Citation:

H. W. Tong and H. Y. Chen, "Evaluation on Excavation Design with VE Method", Advanced Materials Research, Vols. 243-249, pp. 2345-2350, 2011

Online since:

May 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.