The Research on Optimal Design of the Whole Process of the Piles′ Diagonal Brace System Base on Coordinating Space Role

Article Preview

Abstract:

Compare with horizontal support, the bracing systems of pile and oblique brace have obvious advantages in deep excavation. However, because diagonal brace is inconvenient for the construction of structure , the use of this system is limited. Based on the coordinating space role of this support system, planning the excavation and exchanging brace and construction structure as a whole, according to the minimum potential result of a piecewise space unit, this paper introduces the model which are both applied to the excavation stage and exchanging brace stage, and derives the calculation method in relationship to the length of sub region. optimal design of the whole process was proposed for this form. Finally, the feasibility and rationality of the proposed method was verified by the practical engineering. And reached some signifecative conclusions, these can provide reference for the design and construction of such supporting system.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Pages:

2356-2365

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Like QIN, Xiaomo WANG, Yuanzhang LI, Juntian ZHEN. Journal of Engineering Geology,2009/17(1)

Google Scholar

[2] Xichang XU, Xiurun GE.Rock and Soil Mechanics,2006,27(5):705-710.

Google Scholar

[3] Wenchao ShU.Rock and soil Mechanics,2003,24(4):557-560.

Google Scholar

[4] Xichang XU, Shanxiong CHEN, Haibin XU.Rock and soil Mechanics,2006,27(2):180-184.

Google Scholar

[5] Wen'ai GUO. Deling QIAN. Journal of HE Fei University of Technology,2007,30(6):753-756.

Google Scholar

[6] Minitry of Housing and Urban-Rural Development of People's Republic of China. JGJ120-99. Technical Specification for Retaining and Protection of Building Foundation Excavations[S]. Beijing: China Architecture & Building Press, 1999(In Cchinene).

Google Scholar

[7] Minitry of Housing and Urban-Rural Development of People's Republic of China. GB50497-2009, Technical Code for Monitoring of Building Foundation Pit Engineering [S]. Beijing: China Architecture & Building Press, 2009(In Cchinene).

Google Scholar

[8] Kai Ying HUANG. Hongwei XIE, Kanghe XIE. Industrial Construction 2002, vol.32,No.8 P35-P38

Google Scholar

[9] LIU Jun-yan, LIU Yan, WANG Hai-ping. Design of removing diagonal brace in sub region considering coordinating role of space support systems[J],Rock and Soil Mechanics,2010.9,Vol.31 No. 9,P2854-2860

Google Scholar

[10] LIU Yan, LIU Jun-yan, XIN Zhen-yu. SHEN Hao. Support replacement technology of bracing system with oblique bracing + piles in row[J], Chinese Journal of Geotechnical Engineering.2010.7Vol.32 Supp.1 P306-311.

Google Scholar

[11] LIU Yan, LIU Jun-yan, WANG Hai-ping. Removing first and supporting then method for diagonal bracing system[J]. Chinese Journal of Geotechnical Engineering. 2010.8Vol.32 Supp.2 P76-80.

Google Scholar