Study on Underground Utilities Settlement during the Construction of Shield Tunnel

Abstract:

Article Preview

Shield tunneling construction inevitably makes impacts on underground utilities. This paper takes some Metro engineering for background, study the underground utilities settlement rules induced by shield tunneling construction. As for shallow-buried and high ground water table tunnel, the coupling of hydrological and stress field must be paid attention. By seepage continuity equation and hydrodynamic equations, study changing situation of the deformation and stress by contrast the effect of seepage. And, contrast the measured value and simulation value to verify the rationality of using fluid-solid coupling method to forecast the ground settlement during tunnel construction.

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Edited by:

Chaohe Chen, Yong Huang and Guangfan Li

Pages:

3445-3448

DOI:

10.4028/www.scientific.net/AMR.243-249.3445

Citation:

H. X. Sun et al., "Study on Underground Utilities Settlement during the Construction of Shield Tunnel", Advanced Materials Research, Vols. 243-249, pp. 3445-3448, 2011

Online since:

May 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.