Influence Analysis of the Construction of Ground Building to the Underground Shield Tunnel Built Lately

Article Preview

Abstract:

The interval tunnel of Ningbo metro line 2 goes through the site of a car showroom project. By FEM analysis, the internal force of the tunnel is calculated under the ground upper load. From the engineering planning of the two projects, the time interval of the two projects is about six months to twelve months. When the interval tunnel begins to construct, the settlement of the foundation of the showroom is still not finished. By the analysis of consolidation rate of soil, the additional settlement of tunnel caused by the latter settlement of the showroom building is analyzed. And the safety of the tunnel is evaluated according to the analysis.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Pages:

3618-3622

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Code for Design of Building Foundation[S].GB 5007-2002(in Chinese).

Google Scholar

[2] Ling-ling Li, Lizhong Wang. Construction Control and Monitoring of Shield Tunnels under Newly-built Sea Embankments [J]. Chinese Journal of Geotechnical Engineering, Vol. 29 (2007): 995-1002 (in Chinese).

Google Scholar

[3] Chang Peng, et al. Numerical Simulation of Effects of Double-Tube Parallel Shield Tunneling on Neighboring Building [J]. Chinese Journal of Rock Mechanics and Engineering, Vol. 27(2008): 3868-3873(in Chinese).

Google Scholar

[4] Wei Li, Chuan He. Study on Construction Influence of Shield Tunnels Traversing Adjacently under Underground Large-scale Structure [J]. Chinese Journal of Geotechnical Engineering, Vol. 28(2006): 1277-1282(in Chinese).

Google Scholar