[1]
MENG Yan,LEI Mingtang, The present situation and suggestion of tunnel water inrush in karst areas, Carsologica Sinica,2003(4).12.In Chinese.
Google Scholar
[2]
ZOU Chengjie. Engineering geology of hydraulic and hydroelectric projects in karst areas.Beijing: Warterpub,1994. In Chinese.
Google Scholar
[3]
China Railway Siyuan Survey and Design Group Co.,LTD. New project working drawing of the railway from Yichang to Wanzhou-blueprint of Maluqing tunnel.2004-03. In Chinese.
Google Scholar
[4]
GAO Bao-zhu, ZENGMei-xiang. Causes and prevention measures of clogging in the reinjection well of a geothermal double-well system.Hydrological Geology and Engineering Geology, 2007(2): 71-74. In Chinese.
Google Scholar
[5]
ZHU Chao. Research on disaster warning and control measures during tunnel construction of Yiwan railway. Beijing: Beijing Jiaotong University,2008. In Chinese.
Google Scholar
[6]
LI Xiaohong. Research on construction technology of Geleshan tunnel in Karst water-rich area in Yuhuai railway. Chengdu: Southwest Jiaotong University,2000. In Chinese.
Google Scholar
[7]
XI Guangyong. Research on treatment technology of gushing water in long and deep-level tunnel. Chengdu: Southwest Jiaotong University, 2005. In Chinese.
Google Scholar
[8]
LIU Zhaowei, The mechanism of water bursting at karst and its prevention measures.Wuhan:China University of Geosciences,2004. In Chinese.
Google Scholar
[9]
ZHANG Minqing, PENG Feng. Grouting technology of substructure work.Beijing:China Land Press,2008. In Chinese.
Google Scholar
[10]
Yutaka Mochida.Grouting and anchoring in the seikan tunnel. Proceedings of the international symposium on anchoring and grouting techniques dec.7-10.1994. published by econarc communication(group)LTD.Hong kong.
Google Scholar
[11]
WANG Jianxiu. Hydration and waterpower damage of Corrosion rock and its application research on tunnel.Chengdu: Southwest Jiaotong University, 2002.
Google Scholar