Application of GTS-311 Total Station in a Slope-Shaft Breakthrough on Error Analysis

Article Preview

Abstract:

The breakthrough is usually a mine survey work with a strategy meaning for the overall work. This text analyses total station errors and makes use of the error theory by combining an concrete engineering example in order to instruct practice better and reduce the blind work. At the same time, it is necessary to adopt measures to decrease the error in the breakthrough practice, and then to guarantee the breakthrough work smoothly.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Pages:

5839-5844

Citation:

Online since:

May 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jingxiang Gao. Ce Liang Xue[M]. China University of Mining and Technology Press, Xu Zhou 2007, In Chinese.

Google Scholar

[2] Deren Li. Error Processing and Reliable Theory[M].Publishing House of Surveying and Mapping, Beijing 1988, In Chinese.

Google Scholar

[3] Ming Zhang, Pinmin Cha. Application & analysis of breakthroug survey method for mine construction[J]. Mining Engineering, 2005, 4(2): 17-21, In Chinese.

Google Scholar

[4] He Lu. Error control of measurement accuracy in skipshaft transfixion[J]. Gold, 2008, 29(4): 28-30, In Chinese.

Google Scholar

[5] Weixi Yan, Baoyin Liu, Guo-Lin Li. Discussion of Error Control Manner and Effect on Sun Zhuang Large Style Breakthrough Engineering[J]. Mine Survey, 1997,3: 28-31, In Chinese.

Google Scholar

[6] Hongqi Liang, Zhanbin Du. Analysis of Holing Through Survey in Inclines[J]. Coal geology of China, 2004,16(5): 103-105, In Chinese.

Google Scholar