p.5818
p.5822
p.5828
p.5835
p.5839
p.5845
p.5849
p.5854
p.5858
Application of GTS-311 Total Station in a Slope-Shaft Breakthrough on Error Analysis
Abstract:
The breakthrough is usually a mine survey work with a strategy meaning for the overall work. This text analyses total station errors and makes use of the error theory by combining an concrete engineering example in order to instruct practice better and reduce the blind work. At the same time, it is necessary to adopt measures to decrease the error in the breakthrough practice, and then to guarantee the breakthrough work smoothly.
Info:
Periodical:
Pages:
5839-5844
Citation:
Online since:
May 2011
Authors:
Keywords:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: