Application of GTS-311 Total Station in a Slope-Shaft Breakthrough on Error Analysis

Abstract:

Article Preview

The breakthrough is usually a mine survey work with a strategy meaning for the overall work. This text analyses total station errors and makes use of the error theory by combining an concrete engineering example in order to instruct practice better and reduce the blind work. At the same time, it is necessary to adopt measures to decrease the error in the breakthrough practice, and then to guarantee the breakthrough work smoothly.

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Edited by:

Chaohe Chen, Yong Huang and Guangfan Li

Pages:

5839-5844

DOI:

10.4028/www.scientific.net/AMR.243-249.5839

Citation:

Z. R. Gan "Application of GTS-311 Total Station in a Slope-Shaft Breakthrough on Error Analysis", Advanced Materials Research, Vols. 243-249, pp. 5839-5844, 2011

Online since:

May 2011

Authors:

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.