A Loading Test Method of Prototype Structure for Nanjing Changjiang Tunnel

Article Preview

Abstract:

Considering the features of underwater shield tunnel with large cross-section, a prototype test of segmental lining structure for Nanjing Changjiang Tunnel (Φ14.5m) is carried out by using a new loading test method. And with “Multi-function Shield Tunnel Structure Test System” developed according to this test method, the effect of high hydraulic pressure can be equivalently imposed upon the structure by hoop, and then the earth pressure can be equivalently applied to the structure by radial concentrated force. The structures were loaded by the device according to a certain hydraulic and earth pressure. Meanwhile, the mechanical characteristics can be further studied. In a word, it can provide reliable test means for research, design and construction of underwater shield tunnel project.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 250-253)

Pages:

2605-2611

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] HE Chuan, ZHANG Jiangang, YANG Zheng. Model test study on the mechanical characteristics of segment lining for the Wuhan Yangtze River tunnel. China Civil Engineering Journal, Vol.41 (2008), p: 85~90. (in Chinese)

Google Scholar

[2] HE Chuan, FENG Kun, YANG Xiong. Model test of large profile segmental lining for Nanjing Changjiang Tunnel. Chinese Journal of rock mechanics and engineering, Vol.26 (2007), p:2260~2269. (in Chinese)

Google Scholar

[3] Takimoto Takaya, Hayashi Mitsutoshi, Saitoh Masayuki. Loading test of shield tunnel lining (No.1), Procedings of Annual Conference of the Japan Society of Civil Enginneers, Vol.49 (1994), p: 1330~1331. (in Japanese)

Google Scholar

[4] Hiroshi Nakamura, Toshikazu Kubota, Mamoru Furukawa, et al. Unified construction of running track tunnel and crossover tunnel for subway by rectangular shape double track cross-section shield machine. Tunneling and Underground Space Technology, Vol.18 (2003), p: 253~262.

DOI: 10.1016/s0886-7798(03)00034-8

Google Scholar

[5] WANG Rulu, SONG Bo, WANG Qi. Lining experiment and structure analysis of bi-circular shield tunnel with staggered joint splice on segments. Underground Engineering and Tunnels, No.1 (2001), p: 12~15. (in Chinese)

Google Scholar

[6] GUO Zhijie, LU Liang, LIU Zuhua. Loading method of test for double-circular face shield tunnel lining. Structural Engineers, No.3 (2004), p: 64~71. (in Chinese)

Google Scholar

[7] WANG Biao, LIU Zuhua, LU Liang. A loading method of the test for lining whole wreath of Shanghai Chongming Tunnel. Construction Technology, Vol.35 (2006), p: 52~54. (in Chinese)

Google Scholar