Research on Stability Analysis of Rock Bolt Crane Girder Needed

Article Preview

Abstract:

Rock bolt crane girder is a structure form which is widely used in the underground powerhouse of hydropower station. It makes reinforced concrete anchored in the underground powerhouse rock using anchor rod, and makes the reinforced concrete, anchor rod and surrounding rock work together to resist the load. Stability has been a common problem in the realm of engineered construction. This article will analysis the stability of the rock bolt crane girder in a underground powerhouse of hydropower station by using the traditional rigid body limit equilibrium method and the finite element method, and give several destroying forms. The results show that the rigid body limit equilibrium method is flawed, need to be corrected; In overload cases, the contact surface of girder and rock crack, it turns the damage to the bottom O point at the end; When it is simulated by the strength storage method, the crane girder's shear yield slips the damage along the base.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 250-253)

Pages:

2622-2625

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] M.Y.Xu, W.M. Wang, and S.H. Chen:Load calculation in 3D rigid body limit equilibrium method and engineering application,Rock and Soil Mechanics,Vol.25(2004), p.755–758

Google Scholar

[2] X.M.Lu, C.X. Liu:Mechanical analysis and design of crane beam on rock wall for underground power house, Journal of Hohai University (Natural Science), Vol. 35(2007), p.30–34

Google Scholar

[3] G.B. Shi: Analysis of stability for rock-bolt crane beam with non-continuous deformation method, Northwest Water Power ,Vol.1(2006), p.19–21

Google Scholar

[4] G.B. Shi, Y.Q. Liu, and J.C.Li:Discussion on limit equilibrium method of rock-wall crane beam rigid body, Northwest Water Power, Vol.5(2005), p.15–21

Google Scholar

[5] K. Ivanyts, Y. L. Andreikiv, A.O.: State of limiting equilibrium of cracked bodies for mixed macromechanisms of fracture, Materials Science New York, Vol.39(2003), p.472–480

DOI: 10.1023/b:masc.0000010923.65166.4e

Google Scholar

[6] M.M. Stadnyk: Limiting equilibrium of a body with elliptic crack under complex load, Materials Science New York, Vol.106(2009), p.220–226

DOI: 10.1007/s11003-009-9178-3

Google Scholar

[7] X.S. Lin:Stability analysis for underground powerhouse and tunnels of Xiao lang di Multipurpose Dam Projec, Challenges for the 21st Century, Vol.2(1999), p.44–50

Google Scholar

[8] Central-South survey design institute of China hydropower consultant group: Design specifications for rock bolt crane girder in underground powerhouse(Q/CGECC003-2003), Changsha: Central-South survey design institute, (2008), p.18–26

Google Scholar

[9] J.B. Liu, J.H.Ye, Y.X. Liu, S.J.Li,and Z.P. Zhang: Numerical analysis of rock-bolt crane girder based on ANSYS, Journal of Yellow River Conservancy Technical Institute, Vol. 16(2004), p.1–4

Google Scholar