The Durability Measures of the Lining of Newly Built Tunnels from Lining Disease of the Existing Tunnels

Article Preview

Abstract:

The 15 tunnels located in Line Chengkun, Baocheng and Dacheng were investigated by the authors. The tunnel disease was inducted and summarized, and the main disease forms and diseases reasons were analyzed.The five measures ( improve the compactness, control and reduce the initial crack, improve the toughness, reduce the second stiffness and mist curing) are proposed, and can improve the durability of the tunnel lining proved by large number indoor concrete test. The authors hope the results of this paper benefit design and construction.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 250-253)

Pages:

2626-2631

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wang xiaoliang, Zhao yong. Seen the construction of China Railway Tunnel from the figures[J]. Modern Technique of Tunnel, 2006, 43(7), 7-17

Google Scholar

[2] Niu ditao. Durability and life prediction of concrete structures[M]. Beijing: Science Publishing company 2003 21-23

Google Scholar

[3] Identification Center of the Ministry of Railways Engineering. High-speed railway tunnel[M]. Beijing: China Railway Publishing company. (2006)

Google Scholar

[4] Wang jianyu. Thinking about two issues of tunnel construction[J]. Railway Construction Publishing company, 2001(1)

Google Scholar

[5] Guan baoshu. Collection of tunnel design points[M]. Beijing: China Communications Publishing company, (2003)

Google Scholar

[6] Guan baoshu. Collection of tunnel construction points[M]. Beijing: China Communications Publishing company, (2003)

Google Scholar