The Durability Measures of the Lining of Newly Built Tunnels from Lining Disease of the Existing Tunnels

Abstract:

Article Preview

The 15 tunnels located in Line Chengkun, Baocheng and Dacheng were investigated by the authors. The tunnel disease was inducted and summarized, and the main disease forms and diseases reasons were analyzed.The five measures ( improve the compactness, control and reduce the initial crack, improve the toughness, reduce the second stiffness and mist curing) are proposed, and can improve the durability of the tunnel lining proved by large number indoor concrete test. The authors hope the results of this paper benefit design and construction.

Info:

Periodical:

Advanced Materials Research (Volumes 250-253)

Edited by:

Guangfan Li, Yong Huang and Chaohe Chen

Pages:

2626-2631

DOI:

10.4028/www.scientific.net/AMR.250-253.2626

Citation:

J. M. Feng et al., "The Durability Measures of the Lining of Newly Built Tunnels from Lining Disease of the Existing Tunnels", Advanced Materials Research, Vols. 250-253, pp. 2626-2631, 2011

Online since:

May 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.