[1]
Cooper DaLe F, Chapmen C B: Risk Analysis for Large Project.New York . John Wiley and Sons, (1987).
Google Scholar
[2]
J. Liu and Y.F. Ge: Investment risk management for international engineering project. Project Management, 6(2008), pp.46-48.
Google Scholar
[3]
Q. Yao and Y.M. Wang: Risk management research review of our country. Sichuan Building Science, 4(2007), pp.193-196.
Google Scholar
[4]
J. Zhang Z.J. Guo and X. Q. Song: Application of Monto Carlo simulation method to analysis on port investment risk. Port Engineering Technology, 9(2005), pp.29-31.
Google Scholar
[5]
W.K. Chen W.F. Yao and Y.H. Wang: The application of CIM model for the field of public policy decision. Journal of Tianjin University of Technology, 2(2006), pp.16-18.
Google Scholar
[6]
X.Q. Wang and Y. Zhuang: A risk analysis of investment project based on the Monte Carlo simulation model. Industrial Engineering Journal, 9(2007), pp.93-96.
Google Scholar
[7]
D.C. Ding H.J. Min and G.M. Wu: Overview of enterprise risk management modeling. Science of Science and Management of S. &. T, 7(2008), pp.189-184.
Google Scholar
[8]
F.Y. Luo G.B. Wang and W.J. Zhang: Study on construction project cost breakdown system. Journal of tongji university (natural science), 8(2005), pp.1122-1126.
Google Scholar
[9]
N.H. Lv: Investment risk analysis and evaluation of engineering project in present condition. Optimization of Capital Construction, 4(2006), pp.78-81.
Google Scholar