Study on the Application of the New Rock Drifting Technology in Zhangcun Colliery

Article Preview

Abstract:

Based on the main problems of tunneling technology and equipment configuration in the south side main entry of Zhangcun colliery, the mechanized line, support way and cement injection technique were investigated and reformed to solve the problems, then a new tunneling technology in south side main entry was proposed. The practical application result show that using different forms of mechanized tunneling lines can improve the loading and transportation efficiency of rock drift tunneling, correspondingly, improve tunneling speed of rock roadway; the support way and cement injection technique in new technology has a positive effect, create a condition for shortening the time of supporting on working face and cement injection and improve the tunneling speed greatly; with the new technology, the work efficiency improved from 0.88m/worker to 0.2m/worker, and increased by 227%.The project of two main entry driving will be completed in a year, and the ventilation system will be formed a year and a half in advance. According to the annual per capita salary sixty thousand Yuan, it can save labor costs 6.12 million Yuan. The good technology and economic effectiveness will be obtained.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 295-297)

Pages:

631-635

Citation:

Online since:

July 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Z.H. Qi, Y. Wang, S.W. Wang: Research on Coal-mining Laneway Excavating Whole Sets and Constructing Techniques. Coal Technology, Vol.2010(9),p.60. "In Chinese"

Google Scholar

[2] Z.S. Bai, Y.P. Meng, L. Ma. Rapid Construction Technique and Equipments of Rock Roadway in Xingtai Mining Area. Coal Science and Technology, Vol.2009(11),p.65. "In Chinese"

Google Scholar

[3] L. Ma, Z.W. Ding. The Application Research on Backfill Mining Technology of Gangue for Coal Pillar Mining in Xingtai Mining Village. Advanced Material Research, Vol.2011(156), p.225.

DOI: 10.4028/www.scientific.net/amr.156-157.225

Google Scholar

[4] Y.H. Liu, W.G. Hou. The Development and Future of Rock Drivage Technology. Heibei Coal, Vol.1998(4), p.51. "In Chinese"

Google Scholar

[5] X.F. Yin. Research and Practice of Rock Entry Fast Construction. Shandong Coal Science and Technology, Vol.2002(3), p.8. "In Chinese"

Google Scholar

[6] C.Y. Zhou, J.F. Wang. The Application of Full-hydraulic Drill Jumbo with Side Dump Mucker in the Construction of the Rock Gangway. Shandong Coal Science and Technology, Vol.2008(6),p.20. "In Chinese"

Google Scholar

[7] G.Y. Ma. The Application of Full Section Stone Drift Driving Machinery in the Construction of the Rock Gangway of Colliery. Mine Construction Technology,Vol.1992(S1),p.50. "In Chinese"

Google Scholar