The Staged Construction Plan of Free Way Asphalt Pavement

Abstract:

Article Preview

The several-phased construction of highways and asphalt pavements should be carried out in the following situations:the foundations are made of soft soil or low-quality soil, the filling and digging of the foundations are replaced frequently, the traffic calculations are not accurate, and the fund of the initial phase is insufficient. The design of several-phased constructions can be the basis of remainder life concept according the regulations drew up by America Asphalt Association and combined the regular computing process in our country.

Info:

Periodical:

Advanced Materials Research (Volumes 295-297)

Edited by:

Pengcheng Wang, Liqun Ai, Yungang Li, Xiaoming Sang and Jinglong Bu

Pages:

648-652

DOI:

10.4028/www.scientific.net/AMR.295-297.648

Citation:

K. F. Zhou et al., "The Staged Construction Plan of Free Way Asphalt Pavement", Advanced Materials Research, Vols. 295-297, pp. 648-652, 2011

Online since:

July 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.