Proposal and Preliminary Study on Installed Capacity Margin

Abstract:

Article Preview

The capacity of thermal power plants takes up 75 per cent of whole power generation capacity in China, and so a reserve of generation capacity margin that may adapt to the variations in power network load is of paramount importance. This paper proposes a concept: installed capacity margin, and basic mathematic modeling and example is analyzed. It would be supply theoretical help for real little thermal power plants shutdown schedules based on building detailed mathematical models after investigation of region-specific load structure characteristics and installed generator compositions.

Info:

Periodical:

Advanced Materials Research (Volumes 354-355)

Edited by:

Hao Zhang, Yang Fu and Zhong Tang

Pages:

872-876

DOI:

10.4028/www.scientific.net/AMR.354-355.872

Citation:

X. C. Huang and X. Z. Chai, "Proposal and Preliminary Study on Installed Capacity Margin", Advanced Materials Research, Vols. 354-355, pp. 872-876, 2012

Online since:

October 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.