Calculation of Cable Force for Long-Span Rib Arch Bridge Construction under Seasonal Ambient Temperature

Article Preview

Abstract:

Calculation of cable force under seasonal ambient temperature is the key and difficult problem in the construction of long-span rib arch bridge. It affects the final cable forces and deformations of arch rib after arch closure. Unstressed state control method is introduced in the construction of Daning River Bridge; unstressed qualities of ribs and unstressed length of cables can be obtained by optimization analysis of the maximum cantilever state in construction. According to unstressed state control method, the cable forces of each segment were calculated using the forward-iteration method. These results offer the basis for construction control, and guarantee the arch rib line and cable forces to meet the design requirements, and an arch closure with high precision.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 378-379)

Pages:

341-344

Citation:

Online since:

October 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] P. Reddy, J. Ghaboussi and N. M. Hawkins: Journal of Bridge Engineering Vol. 4(4) (1999), pp.249-257.

Google Scholar

[2] Xiaoli Xie, Guofan Zhao, Anni Hu et al.: Engineering Mechanics Vol. 22(4) (2005), pp.62-66, in Chinese.

Google Scholar

[3] Guangya Tu, Donghuang Yan, Kebo Zhang: Engineering Mechanics Vol. 25(4) (2008), pp.236-240, in Chinese.

Google Scholar

[4] Hongtian Du, Mingzhong Zhang: Railway Standard Design Vol. 3 (2008), pp.91-93, in Chinese.

Google Scholar

[5] Xiumei Li, Lian Lai, Xiaoli Xie: Central South Highway Engineering Vol. 29(4) (2004), pp.29-32, in Chinese.

Google Scholar

[6] Sunquan Qin : Bridge Construction Vol. 184(2008), pp.8-14, in Chinese.

Google Scholar

[7] Shuixing Zhou, hongbin Xiong, Min Zhang et al.: Journal of Chongqing Jiaotong University Vol. 21(2) (2002), pp.6-8, in Chinese.

Google Scholar

[8] Gaiwei Mei, Min Zhang, Shuixing Zhou: Journal of Chongqing Jiaotong University Vol. 28(2) (2009), pp.199-202, in Chinese.

Google Scholar

[9] Yuancheng Peng, Gujian Huang, Wenjun Wang et al.: proceedings of the 6th International Conference on Arch Bridges, Fuzhou, China, October11-13, (2010), pp.157-162.

Google Scholar

[10] Shuixing Zhou, Xiaoping Du, Dan Li et al.: proceedings of the 6th International Conference on Arch Bridges, Fuzhou, China, October11-13, (2010), pp.188-193.

Google Scholar