A Study on Ceramsite Pre-Wetted Time to Work on the Performance of Ceramsite Aggregate Concrete

Article Preview

Abstract:

This paper analyzes the reasons for delamination of ceramsite aggregate concrete mixture, obtained influencing factors of working performance based on the study of equations of lightweight aggregate motion. Moreover, by experimental study of the different pre-wetted time conditions on working performance, a reasonable pre-wetted time of ceramsite before ceramsite aggregate concrete for construction is summarized as well.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 393-395)

Pages:

11-14

Citation:

Online since:

November 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Qingjun Ding, Yong Zhang, Fazhou Wang: Research on control technology of segregation of high strength lightweight aggregate concrete. Wu han University Journal of Natural Sciences. Vol 35-3(2002), P 59-62.

Google Scholar

[2] Zhiqing Cheng: Study of high performance expanded shale aggregate concrete. Master's degree thesis of Central South University. (2007).

Google Scholar

[3] Yujun Li, Jiantong Ding: Segregation capability of fresh high strength lightweight aggregate concrete. Sichun Building Science. Vol 31-5(2005), P 103-107.

Google Scholar

[4] Shuguang Hu, Fazhou Wang, Qingjun Ding: Influence of water absorption and pre-wetted method of lightweight aggregate on the workability of concrete Journal of huazhong university of science and technology. Vol 19-2(2002), P 1-4.

Google Scholar

[5] Xiuhua Zhang, Baosheng Zhang: Effect of pre-wetted shale ceramsite on strength and frost-resistance of lightweight aggregate concrete. Vol 33-6(2005). P 758-762.

Google Scholar