The Stress and Displacement Analysis of the Cut-Off Wall for the Deep Overburden Dam

Article Preview

Abstract:

The Duncan-Chang nonlinear constitutive model is used to carry out a three-dimensional finite element analysis of Xia Ban Di deep overburden dam with clay core. The regularities of the horizontal displacement, vertical stress and stress level for the cut-off wall are studied in this paper, and the paper provided reference for the dam stability and anti-seepage treatment of the cut-off wall with deep overburden.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 393-395)

Pages:

463-466

Citation:

Online since:

November 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yuzheng Yu, Jialin Pu, and Fengde Liu: Journal of Hydraulic Engineering Vol. 8(1995), pp.21-27, in Chinese.

Google Scholar

[2] Xingwang Dou, Yixing Lin, Songyou Xia et al: Advances in Science and Technology of Water Resources Vol. 6(2000), pp.19-22, in Chinese.

Google Scholar

[3] Chunlou Ji, Songyou Xia, Desheng Deng: Journal of He Hai University Vol. 5(1995), pp.74-80, in Chinese.

Google Scholar

[4] Jiahuan Qian, Zongze Yin: Geotechnique Principle and Computation(second edition)( China WaterPower Press, Beijing 1996) , in Chinese.

Google Scholar

[5] Peng Li et al: Report on the Static Characteristics of the Sand Soil in Dam Foundation(Experiment Center of Northwest Hydraulic Research Institute, 2002) , in Chinese.

Google Scholar