Study on a Practical Case of Cleaner Production Audit

Article Preview

Abstract:

Through the extensive research and deep analysis of existing problems in cleaner production, four middle/high expense plans were set forth, demonstrated and implemented. These four implement plans included high efficient steam traps, energy saving system of steam boiler, improved sewage treatment facilities and vacuum raw material feeder. The total investment was 330 thousand Yuan RMB. The annual discharge of waste water was reduced by about 30 thousand tons and annual economic profit was 680 thousand Yuan RMB. Moreover, better environmental and social benefit was created. More importantly, a sustainable cleaner production mechanism was established for the factory.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 424-425)

Pages:

1334-1337

Citation:

Online since:

January 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] J. Guinee,et al., Handbook on life cycle assessment: Operational Guide to the ISO standards, Dordrecht, the Nertherlands:Kluwer Academic Publishers, (2002)

Google Scholar

[2] W.J. Tang. Study on cleaner production of pharmaceutical enterprise-take Yangzhou pharmaceutical plant as an example. Water resource protection. 2005.3(5):63-66 (In Chinese)

Google Scholar

[3] R.J. Su, Zhanguo Lu, et al. Advanced treatment of wastewater from bismuth aluminate compound tablets production using Fenton reagent.《Industrial Water & Wastewater》, 2008, 39(3):68-71 (In Chinese)

Google Scholar