Advanced Materials Research
Vols. 443-444
Vols. 443-444
Advanced Materials Research
Vol. 442
Vol. 442
Advanced Materials Research
Vol. 441
Vol. 441
Advanced Materials Research
Vols. 433-440
Vols. 433-440
Advanced Materials Research
Vols. 430-432
Vols. 430-432
Advanced Materials Research
Vol. 429
Vol. 429
Advanced Materials Research
Vol. 428
Vol. 428
Advanced Materials Research
Vol. 427
Vol. 427
Advanced Materials Research
Vol. 426
Vol. 426
Advanced Materials Research
Vols. 424-425
Vols. 424-425
Advanced Materials Research
Vol. 423
Vol. 423
Advanced Materials Research
Vol. 422
Vol. 422
Advanced Materials Research
Vol. 421
Vol. 421
Advanced Materials Research Vol. 428
Paper Title Page
Abstract: In order to settle the influence easily on the foundation soil of high liquid limit red clay by free water in Southern hot and humid regions, and to increase the carrying capacity of the foundation soil, combined with ning (yuan) - dao (county) highway entity engineering, the thought was put forward that to construct the 20cm thick graded crushed rock subcrust (crushed run rock) on the top of the roadbed finish machining area, and analyze the strength forming principle of the crushed run rock subcrust ,and make the mix design, then get the optimum water content and the quality control standard, and propose the key technology of the crushed run rock subcrust’s construction through the experimental road paving experience.
206