Construction Optimization of the Bridge-Tunnel Sections

Article Preview

Abstract:

The construction method of the joint section connecting bridge and tunnel was simulated by FEM. After Calculating and comparing the result of stresses and effect of displacement-control in the surrounding rock under three methods of construction, it shown that the side heading method was very advantageous for the stress concentration, and the CRD method provided a good control of bottom heave, as for the top heave, the double side heading method was more favorable. From the dynamic analysis, the vehicle load is found to have, though small, wide influence. What’s more, the lapping distance between the bridge and tunnel is better more than 4m, and the influence from the high running speed should be paid attention to.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 430-432)

Pages:

408-413

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shu-ren Wang, Hai-qing Zhang, Nai-qi, Shen Hai-ying Cao. Chinese Journal of Rock Mechanics and Engineering. Vol. 28(2009), pp.1144-1150, in Chinese.

Google Scholar

[2] Guang Zheng, Qiang Xu, Yu-ben Du. Journal of Chengdu University of Technology (Science & Technology Edition). Vol. 38(2011) , pp.1144-1150, in Chinese.

Google Scholar

[3] Yong Li, Hao Ding. Chinese Journal of Underground Space and Engineering. Vol. 3(2006), pp.416-419.

Google Scholar

[4] Ya-hong Deng, Tang-dai Xia, Jing-yu Chen. Chinese Journal of Geotechnical Engineering vol28(2006) , p.2111~2116, in Chinese.

Google Scholar

[5] Xing-qiang Zhang. Highway, Vol. 8(2008), p.28~32, in Chinese.

Google Scholar