Evaluation of Development Process of Strategic UAV Considering the Risk

Article Preview

Abstract:

Economic evaluation of macro projects requiring a high volume of investment is one of important issues in the area of financial research. To deal with this problem, a great number of models such as direct operating cost, discounted cash flow analysis (e.g. net present value or internal rate of return), decision tree and real option analysis have been developed. Application of real option analysis has drawn more attention in recent researches because of the ability to assess the flexibility and considering the risk. In the present article, also, this theory is used to evaluate the development process of strategic unmanned aerial vehicle (UAV). To do this, a model comprising 4 development stages is used with each stage applying a novel approach to implement the model. In particular, we have tried to calculate and include the risk in an organized form in the model. Results obtained from a case study will be described at the end.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 433-440)

Pages:

1506-1512

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] T. Chen, J. Zhang, and K. Lai, An integrated real options evaluating model for information technology projects under multiple risks, International Journal of Project Management, vol. 27, Issue 8, Nov. 2009, pp.776-78.

DOI: 10.1016/j.ijproman.2009.01.001

Google Scholar

[2] B. Miller and J. Clarke, Strategic guidance in the development of new aircraft programs: a practical real options approach, IEEE Transactions on Engineering Management, vol. 55, issue 4, Nov. 2008, p.566 – 578, doi: 10. 1109/TEM. 2008. 927817.

DOI: 10.1109/tem.2008.927817

Google Scholar

[3] E. Roghanian, S.J. Sadjadi, and M.B. Aryanezhad, A probabilistic bi-level linear multi-objective programming problem to supply chain planning, Applied Mathematics and Computation, vol. 188, Issue. 1, May. 2007, pp.786-800.

DOI: 10.1016/j.amc.2006.10.032

Google Scholar

[4] K. Yeo and F. Qiu, The value of management flexibility—a real option approach to investment evaluation, International Journal of Project Management, Vol. 21, Issue. 4, May. 2003, pp.243-250 doi: 10. 1016/S0263-7863(02)00025-X.

DOI: 10.1016/s0263-7863(02)00025-x

Google Scholar

[5] G. A Zsidisin, A Grounded definition of supply risk, Journal of Purchasing & Supply Management, Vol. 9, Issues 5-6, Sep. -Nov. 2003, Pages 217-224, doi: 10. 1016 /j. pursup. 2003. 07. 002.

DOI: 10.1016/j.pursup.2003.07.002

Google Scholar

[6] C. Harland , R. Brenchley, and H. Walker, Risk in Supply Networks, Journal of Purchasing & Supply Management, Vol. 9, Issue. 2, March. 2003, pp.51-62, doi: 10. 1016/S1478-4092(03)00004-9.

DOI: 10.1016/s1478-4092(03)00004-9

Google Scholar

[7] Institute of Risk Management. A risk management standard, London: IRM, (2002).

Google Scholar

[8] P.R. Gallati, Risk management and capital adequacy, McGraw-Hill, (2003).

Google Scholar

[9] A. Mobey and D. Parker, Risk evaluation and its importance to project implementation, Work Study, vol. 51 , issue. 4, p.202 – 208, doi: 10. 1108/00438020210430760.

DOI: 10.1108/00438020210430760

Google Scholar

[10] C. Kahraman, G. Buyukozkan, and N.Y. Ates, A two phase multi-attribute decision-making approach for new product introduction, Fuzzy set applications in industrial engineering, vol. 177, issue 7, April. 2007, pp.1567-1582.

DOI: 10.1016/j.ins.2006.09.008

Google Scholar

[11] K.S. Chin , D.W. Tang, J.B. Yang, S.Y. Wong, and H. Wang, Assessing new product development project risk by Bayesian network with a systematic probability generation methodology, Expert Systems with Applications, vol. 36, issue. 6, August 2009, pp.9879-9890.

DOI: 10.1016/j.eswa.2009.02.019

Google Scholar

[12] D.S. Doering and R. Parayre, Identification and assessment of emerging technologies., 2002, In: Day, G., et al. (Eds. ), Wharton on Managing Emerging Technologies. Wiley, New York, p.75–98.

Google Scholar

[13] J. Wang, W. Lin, and Y.H. Huang, A performance-oriented risk management framework for innovative R&D projects, Technovation vol. 30, issues. 11-12, Nov. -Dec. 2010, pp.601-611, doi: 10. 1016 /j. technovation. 2010. 07. 003.

DOI: 10.1016/j.technovation.2010.07.003

Google Scholar

[14] F.H. Knight, Risk, Uncertainty and Profit, New York: Cosimo , 1921 (reprint in 2005).

Google Scholar

[15] R. D Luce and H. Raiffa, Games and Decisions, Introduction and Critical Survey, New York: John Wiley & Sons, (1957).

Google Scholar

[16] Project Management Institute, A Guide to the project management book of knowledge (PMBOK), 3rd ed. Project Management Institute, Newtown Square, PA, (2004).

DOI: 10.1556/9789634545019

Google Scholar

[17] F.J. Milliken, Three types of perceived uncertainty about the environment: state, effect, and response uncertainty,. Academy of Management Review, vol. 12, issue. 1, Jan. 1987, pp.133-143.

DOI: 10.5465/amr.1987.4306502

Google Scholar

[18] H . Sicotte and M. Bourgault, Dimensions of uncertainty and their moderating effect on new product development project performance, R&D Management, vol. 38, issue. 5, pp.468-479, Nov. (2008).

DOI: 10.1111/j.1467-9310.2008.00531.x

Google Scholar

[19] P.G. Smith, Managing risk as product development schedules shrink, Research Technology Management , vol. 42, issue. 5, p. p.25–32, (1999).

DOI: 10.1080/08956308.1999.11671302

Google Scholar

[20] T.R. Browning, J.J. Deyst, S.D. Eppinger, and D.E. Whitney, 2002. Adding value in product development by creating information and reducing risk, IEEE Transactions on Engineering Management, vol. 49, issue. 4, p.443.

DOI: 10.1109/tem.2002.806710

Google Scholar

[21] T. Raz, A.J. Shenhar, and D. Dvir, Risk management, project success, and technological uncertainty, R&D Management, vol. 32, issue. 2, March. 2002 , pp.101-109.

DOI: 10.1111/1467-9310.00243

Google Scholar

[22] P.G. Smith and G.M. Merritt, Proactive Risk Management: Controlling Uncertainty in Product Development, New York: Productivity Press, June (2002).

Google Scholar

[23] K.J. Wendy, C. Zunker, J. C. Feucht, S. L. Fitzpatrick, L. F. Greene , R.M. Shewchuk , M.L. Baskin , N.W. Walton , B. Phillips , J.D. Ard., Use of the Nominal Group Technique (NGT) to understand the perceptions of the healthiness of foods associated with African Americans, Evaluation and Program Planning, vol. 33, issue. 4, Nov. 2010, pp.343-348.

DOI: 10.1016/j.evalprogplan.2009.11.002

Google Scholar

[24] S.H. Liao, S.H. Ho, Investment project valuation based on a fuzzy binomial approach, Information Sciences, vol. 180, issue. 11, June. 2010, pp.2124-2133 , doi: 10. 1016/j. ins. 2010. 02. 012.

DOI: 10.1016/j.ins.2010.02.012

Google Scholar