Risk Prevention and Control Measures in Highway Design and Construction Turnkey Project

Article Preview

Abstract:

In order to ensure the highway design and construction turnkey project smooth implementation, it is necessary to proactively consider risks produced by highway design and construction turnkey model, and to input specific risk prevention and corresponding risk control measures. This paper firstly discusses risk control measures for highway design and construction turnkey model. Then, risk is reasonably contributed both the owners and general contractors. The risk range has also be defined between the owner and general contractor. In the ending of this article, there are some recommendations about risk prevention and control measures for highway design and construction turnkey project.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

3814-3819

Citation:

Online since:

January 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Dekker and Van den Abbeele, 2008 Dekker, H.C., Van den Abbeele, A., 2008. Partner selection, knowledge acquisition and interfirm governance design. In: Proceedings of the Management Accounting Section Midyear Meeting of the American Accounting Association, Long Beach, CA..

DOI: 10.2139/ssrn.1003961

Google Scholar

[2] Ferrin and Plank, 2002 B.G. Ferrin and R.E. Plank, Total cost of ownership models: an exploratory study. The Journal of Supply Chain Management,  Summer  (2002), p.18–29.

DOI: 10.1111/j.1745-493x.2002.tb00132.x

Google Scholar

[3] Gibb and Isack, 2001 A.G.F. Gibb and F. Isack, Client drivers for construction projects: implication for standardisation. Engineering, Construction and Architectural Management,  81 (2001), p.46–58.

DOI: 10.1108/eb021169

Google Scholar

[4] Giunipero and Eltantawy, 2004 L.C. Giunipero and R.A. Eltantawy, Securing the upstream supply chain: a risk management approach. International Journal of Physical Distribution and Logistics Management,  349 (2004), p.698–713.

DOI: 10.1108/09600030410567478

Google Scholar

[5] Hsu et al., 2006 C.C. Hsu, V.R. Kannan, G.K. Leong and K.C. Tan, Supplier selection construct: instrument development and validation. The International Journal of Logistics Management,  172 (2006), p.213–239.

DOI: 10.1108/09574090610689961

Google Scholar

[6] Hurkens et al., 2006 K. Hurkens, W. Van der Valk and F. Wynstra, Total cost of ownership in the services sector: a case study. The Journal of Supply Chain Management,  Winter (2006), p.27–37.

DOI: 10.1111/j.1745-493x.2006.04201004.x

Google Scholar

[7] Matos, 2007 M.A. Matos, Decision under risk as a multi-criteria problem. European Journal of Operational Research,  1813 (2007), p.1516–1529.

DOI: 10.1016/j.ejor.2005.11.057

Google Scholar

[8] Micheli, 2008 G.J.L. Micheli, A decision-maker-centred supplier selection approach for critical supplies. Management Decision,  466 (2008), p.918–932.

DOI: 10.1108/00251740810882671

Google Scholar

[9] Micheli et al., 2008a G.J.L. Micheli, E. Cagno and M. Zorzini, Supply risk management vs supplier selection to manage the supply risk in the risk supply chain. Management Research News,  3111 (2008), p.846–866.

DOI: 10.1108/01409170810913042

Google Scholar