Analysis of Hydropower Project Financing Risk TOT Mode Using the CIM – AHP Mode — Nansha Hydropower Station in Yunnan as an Example

Article Preview

Abstract:

TOT as a new project financing mode, its appearance effectively solves problems like the lack of government investment funds, management inefficiency and others. But because of its complex organizational structure involving more than one principal, the potential risk is enormous. In this paper, I use AHP method to conduct comprehensive and systematic risk identification for TOT projects and establish the control interval and memory (CIM) model to assess the risks of hydropower financing. The application of CIM in engineering practice shows the effectiveness and feasibility of CIM, the comprehensive evaluation method in the risk assessment.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 468-471)

Pages:

260-267

Citation:

Online since:

February 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Songjiang WANG, "Managing Public Infrastructure TOT Project Financing Management", Beijing: Science Press,2011, p.5.(In Chinese)

Google Scholar

[2] Abdelkhalek H A.J. Journal of Engineering and Applied Science, Vol. 52 (2005):P. 715-731.

Google Scholar

[3] Chapman C B, Cooper D . J. the Operational Research Society,Vol. 34 (1993), pp.51-60.

Google Scholar

[4] Songjiang WANG,"Economic Cooperation by TOT Project between China and Vietnam", Yunnan Technology Press, p.24, November 2006 .(In Chinese)

Google Scholar

[5] C.B. Chapman,Project Management,Vol. 18 (1990):P. 45-56.

Google Scholar