[1]
Ben-Akiva M, De Palma A, Kaysi I. Dynamic network models and driver information systems[J]. Transportation Research A, 1991, 25:251-266
DOI: 10.1016/0191-2607(91)90142-d
Google Scholar
[2]
Ben-Akiva M, Koutsoploulos H N, Mishalani R G, Yang Q. Simulation laboratory for evaluating dynamic traffic management systems[J]. Journal of Transportation Engineering, 1997, 123:251-266
DOI: 10.1061/(asce)0733-947x(1997)123:4(283)
Google Scholar
[3]
Yeqiang Gao. An ARMA based Expressway Maintenance and Management Capital Demand Prediction[J]. Science Technology and Engineering, 2011, 7:1636-1639, 1648.
Google Scholar
[4]
Ben-Akiva M, Cuneo D, Hasan M, Jha M, Yang Q. Evaluation of freeway control using a microscopic simulation laboratory[J]. Transportation Research C, 2003, 11:29-50
DOI: 10.1016/s0968-090x(02)00020-7
Google Scholar
[5]
Hu T Y, Mahmassani H S. Day-to-day evolution of network flows under real-time information and reactive signal control[J]. Transportation Research C, 1997, 5:51-69
DOI: 10.1016/s0968-090x(96)00026-5
Google Scholar
[6]
Liu Y H,, Mahmassani H S. Dynamics aspects of commuter decisions under Advanced traveler information systems-modeling framework and experimental results [J]. Transportation Research Record, 1998, 1645:111-119
DOI: 10.3141/1645-14
Google Scholar
[7]
Ying Yu, Qiling Wang, Jinyue Tian. Forecast model of expressway maintenance cost[J].Journal of traffic and transportation engineering,2007(03).
Google Scholar
[8]
Zhihong Chang. Research about full-operation-cycle maintenance cost control of expressway[D].Shan Dong University ,2008.
Google Scholar
[9]
Zhongwen He, Shaoqiang Huang. The using of zero base budget management method in expressway operation cost control [J].Highway,2004(08).
Google Scholar
[10]
MI Huiqin.Expressway Operation Cost and the Control Discussion[J].Technology and Economy in Areas of Communication, 2008,49(5):125-126.
Google Scholar
[11]
YAO Ye. Expressway Operation Cost and the Control Discussion[J].Economics,2010(8):240-241.
Google Scholar