p.981
p.987
p.992
p.997
p.1003
p.1008
p.1014
p.1020
p.1024
Research of Hybrid Scheduling Based on Network Calculus in Coal Mine Ethernet
Abstract:
According to the characteristics of data in coalmine industrial Ethernet ring networks and in order to guarantee the demand of the real-time data in it, a hybrid scheduling method with non-preemptive priority and EDF scheduling method based on the IEEE802.1p protocol is proposed in the switch. We calculate the maximum transmitting delay of the real-time data using network calculus theory. The result shows that EDF decreases transmission delay for non-periodic data better than FCFS by theoretical computation and simulation.
Info:
Periodical:
Pages:
1003-1007
Citation:
Online since:
July 2012
Authors:
Keywords:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: