3D Modeling and Motion Simulation of Mine Skip Getting through Dump Rail Based on Pro/E

Article Preview

Abstract:

3D modeling, virtual assembly and motion simulation of an up-open fan gate mine skip were completed with Pro/Engineer software. During virtual design, faults of a mine skip such as static and dynamic interference can be found out prior to be made, which is helpful to optimize it. Furthermore, it is effective to shorten design period of mine skip and save development cost and improve design quality.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 557-559)

Pages:

2176-2180

Citation:

Online since:

July 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Mingxia Yan and Boqiang Shi: Coal Mine Machinery. Vol. 28, 1 (2007), p.25(in Chinese)

Google Scholar

[2] Qinfang He and Zheng Xu: Product Design and Mechanism Dynamic Analysis Based on Pro/ENGINEER Wildfire (Publishing House of Electronics Industry, Beijing 2005).

Google Scholar

[3] Yulong Han. Professional Courses on Component Design and Movement Simulation (Publishing House of Qinghua University, Beijing 2004 ).

Google Scholar