3D Digitalization Modeling for Visualization of Dam Construction Process

Article Preview

Abstract:

It is established a visualization simulation mechanism of dam construction process at first. Then terrain contours are converted into grid mesh by contours discrete method to establish the terrain model. The 3D dam model, foundation pit, construction road are built. Then the dam model is digitalized to create the dam database. After that, all of the models are rendered by using 3DSMax, and then documents of models and materials are exported with a plugin of OgreMaxSceneExporter to assure that they can be identified by an effective graphics rendering engine--OGRE. Finally, a dam construction process visualization system for a practical case is developed, by which an interactive virtual reality environment is created for engineers and administrators.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

2951-2956

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Vineet R. K., Julio C.M.. Visualizing Simulated Construction Operations in 3d[J]. Journal of computing in civil engineering, ASCE, 2001,15(4):329-337.

Google Scholar

[2] Zhong D., Zheng J., Liu D.. Visualization simulation technique and its application[M].Beijing: China Water Conservancy and Hydropower Press, 2002. (in Chinese)

Google Scholar

[3] Zhong D., Li J., Zhu H., et al. Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes[J]. Journal of Construction Engineering and Management, ASCE, 2004,130(5):742-750. (in Chinese)

DOI: 10.1061/(asce)0733-9364(2004)130:5(742)

Google Scholar

[4] Javier I., Dulcy M.A.. Application of Virtual Reality Technology for the Improvement of Safety in the Steel Erection Process: Computing in Civil Engineering, ASCE, 2005:1-11.

DOI: 10.1061/40794(179)148

Google Scholar

[5] Yang L., Zhang A., Liu X.. Reconstruction of outdoor scenes based on VTK[J]. Journal of system simulation, 2006,18(2):411-414. (in Chinese)

Google Scholar

[6] Huang Y., Zhou Y., Liu Q., et al. Research on visualization of hydropower engineering construction site layout based on object-oriented simulation[J]. Journal of system simulation, 2006,18(8):2210-2213. (in Chinese)

Google Scholar

[7] Tiago M. B., Sergio S.. CAD and CAE Integration Through Scientific Visualization Techniques for Illumination Design[J]. Tsinghua Science and Technology, 2008, 13(S1):26-33.

DOI: 10.1016/s1007-0214(08)70122-6

Google Scholar

[8] Tsai V J D. Delaunay Triangulation in TIN Creations: An Overview and a Liner Time Algorithm[J].International Journal of Geographical Information System, 1993, 7(6):501-524.

Google Scholar