Application of Fuzzy Comprehensive Evaluation Method Considering Risk Factors in Project Schedule Management

Article Preview

Abstract:

The reliability of schedule management directly affects the project cost and quality. Time limit is the most important part in schedule management. The determination of reasonable time limit can save cost for investors, and ensure project quality .Based on this characteristic, this paper adopts utility curve to carry out risk analysis for risk factors, eliminates unreliable construction period and carries on fuzzy comprehensive evaluation for the rest of the possible period. Then it got scientific and reasonable time limit. The method can determine the construction period credibly and is used to guide engineering practical.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

2976-2981

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xiaohui Zou. Schedule Management Information System of Hydropower Project[D].Wuhan: Huazhong University of Science and Technology(2004) (in chinese)

Google Scholar

[2] Zonghe Yu,in:Discussion on Schedule control theory and method :submitted to Journal of Optimization of Capital Construction(2000) (in chinese)

Google Scholar

[3] Feng Cai. Research on Construction Project Schedule Management based on Fuzzy Comprehensive Evaluation. Tianjing:Tianjin University (2007) (in chinese)

Google Scholar

[4] Hongwei Huang, Long Chen, Qunfang Hu, Guixiang Chen, Yan Wang. the whole life risk management of tunnel and underground engineering, edited by Science Press, Beijing (2010) , in press. (in chinese)

Google Scholar

[5] Saaty, T.L. Multicriteria decision-making:the analytic hierarchy process. University of Pittsburgh, Pittsburgh, PA (1988)

Google Scholar