p.2990
p.2994
p.2998
p.3002
p.3006
p.3011
p.3015
p.3019
p.3024
Study on the Selection of Subcontractors Based on Fuzzy Comprehensive Evaluation
Abstract:
From the point view of the general contractor, we can analysis of the various factors which affect the selection of subcontractors and construct them as the basis for the comprehensive evaluation index system of the subcontractors’ capacity risks. Then we can use Fuzzy Comprehensive Evaluation method to put forward the selection of subcontractors based on Fuzzy Comprehensive Evaluation. Finally, we list some engineering project examples to verify the feasibility and practical of the comprehensive evaluation system to provide references and recommendation for general contractor on evaluation and selection of subcontractors.
Info:
Periodical:
Pages:
3006-3010
Citation:
Online since:
November 2012
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: