A Quality Cost Evaluation Model of Construction Enterprises Based on Unascertained Method

Article Preview

Abstract:

In view of the study on the quality cost prediction of construction enterprises, this paper established a relatively good index system of quality cost projections. The quality cost of construction enterprise is evaluated by introducing a new mathematical model —Uncertaintymethod. As a new Uncertainty information processing method, Unascertained overcomes the shortcomings of fuzzy evaluation method does not meet the measurement criteria.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

3002-3005

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhu Changqing. Application of Quality Cost Management in Construction. Journal of railway Engineering society, 2005,4:91-95)

Google Scholar

[2] Cao Qingkui, Yang Yanli Yu Ruilong. The coal mines safety appraisal based on unascertained set. Journal of China Coal Society, 2007,32(2):181-185

Google Scholar

[3] Liu Kaidi, Cao Qingkui, Pang yanjun. A Method of Fault Diagnosis Based on Unascertained Set. Acta Automatica Sinica, 2004,30(5):747-756

Google Scholar